All eazyBI for Jira eazyBI for Confluence Private eazyBI

Pull requests overview
eazyBI for Jira

On this page:

Overview

The report shows a pull request overview of how many have been merged versus declined.

How to build it

To build this report start with the table view and select the Time dimension in Rows. Then in the Measures dimension, select measure Pull request merged and Pull requests declined, then unselect default measure "Issues created". 

eazyBI imports only those pull requests that have an issue key linked to them (either in the title, comment, or in the commit message). In this way, eazyBI can display the pull requests on the issue-level.

To have a cumulative sum for both measures use standard calculation "Cumulative sum including empty" and create new measures Cumulative Pull requests merged and Cumulative Pull requests declined. After creating calculations remove the measures "Pull request merged" and "Pull requests declined".

Configure Time dimension as it is more comfortable, e.g. "Day" to see how many deployments were at each day. Add "Time" dimension to Pages. Select member Last 12 months and apply this member in Page filter. Add also Project dimension into Pages and select projects that have related DevOps metrics. When eazyBI creates sample reports then the top 3 projects are automatically selected.

Switch to the Timeline tab and select the Area and Stacked option. 

See also