All eazyBI for Jira eazyBI for Confluence Private eazyBI

Average change lead time
eazyBI for Jira

On this page:

Overview

This report shows the part of the issue life cycle starting from the development moment until delivery to production.

How to build it

To build this report, start with the table view and drag and drop Project dimension in Rows, select "Project" level to see data per each project. Add "Project" dimension into Pages and select projects that have related DevOps metrics. When eazyBI creates sample reports, then the top 3 projects are automatically selected.

Then in the Measures dimension, select measures Average change build lead time and Average change deploy lead time and unselect default measure "Issues created".

  • "Average change build lead time" - the average time it takes from the first commit until the build is completed.
  • "Average change deploy lead time" - the average time it takes from the first commit until the deploy completed in Bamboo.

Add Time dimension to Pages. Select member Last 12 months and apply this member in Page filter.

Switch to the Gauge tab, and in the toolbar, select option Only values. And add Gauge limits for each measure. Note that the original measure is in minutes and only formatted to ##d ##h ##m, so when adding the limits, specify them in minutes. E.g., color everything around 2000min as green, orange when approaching 5000min and red over 10000min.

See also