Story Points balance by sprints
eazyBI for Jira

On this page:

Overview

Track the story points balance by sprints in the selected project – story points committed, added, changed vs story points completed, removed, not completed. The measures are grouped on two bar charts to identify measures for incoming story points versus outgoing story points in the sprint. 

How to build it

To build this report, start with the table view and select the Sprint dimension in Rows, select the "Sprint" level from the "By status" hierarchy to see the report information at the sprint level.

In the Measures dimension, select measures: 

Unselect the default measure "Issues created".

In Pages, select the dimension "Project" for filtering. When the sample report is created in eazyBI, eazyBI automatically selects the first project with report measures for filtering. Additionally, add "Issue type" in Pages and select "All Issue Types by type" from the "By type" hierarchy to filter issues by Standard issue types. Also, add a "Sprint" dimension in "Pages" and filter all Closed sprints. Select the option "Hide empty rows" to hide rows without data.

Then, switch to the Bar tab and select Vertical and Stacked in the toolbox options. Change colors for measures. To measure "Sprint Story Points commitment changes," change the chart type to a dash line. Use a separate axis (for example, 1) to show another stacked bar of outgoing stories for measures "Sprint Story Points completed", "Sprint Story Points removed," and "Sprint Story Points not completed". Add a description to the report.